Completed SSL / SSR strip-out, demolition and enabling works.

Internal soft-strip, fit-out removal and waste clearance
A city-centre café unit inside Manchester Arndale had to be stripped back around retained staircases, WCs and shopfront. We removed the fit-out, linings and floor finishes and cleared waste through the centre’s loading arrangements, leaving the unit ready for its next retail fit-out.

Internal soft-strip, redundant services removal and waste clearance
Tilbury Hall needed the existing office fit-out at Halifax House removed before refurbishment. We stripped floors, ceilings, partitions, kitchens and redundant services after isolation by others, separating materials on site to prepare the space for the next stage.

Internal soft-strip, Selected demolition, Redundant services removal, Waste clearance
ROM Construction needed three floors of an existing building stripped back for refurbishment, with clear limits on what stayed. We delivered the internal removals and waste clearance, with 20.896 tonnes of transfers documented across 12 tickets (16 June – 2 July 2026).