Health & Safety

Safety planned in, not bolted on.

Every project is planned around the specific site, the specific building and the specific people working around us.

01

Site-specific RAMS

Risk assessments and method statements written for each project, not copy-pasted.

02

PPE & inductions

Every operative in full PPE, inducted to your site and briefed on the specific works.

03

Controlled waste routes

Planned waste routes through the building — service lifts, protected corridors, timed movements.

04

Protection of live areas

Hoarding, sheeting, dust screens and floor protection to keep live areas clean and safe.

05

Manual handling planning

Heavier items sequenced with the right kit and the right team to keep operatives safe.

06

Working around other trades

Sequenced strip-out to keep out of the way of follow-on trades and main contractor programmes.

Pre-start checklist

Before we start on site

We need the following confirmed before works begin so the job can be planned and carried out safely.

Live services are isolated by others before our strip-out works begin, unless agreed separately in writing.

  1. 01Asbestos information / R&D survey where required
  2. 02Service isolations completed by others
  3. 03Waste route and loading arrangements
  4. 04Working hours / out-of-hours requirements
  5. 05Welfare and site access
  6. 06Retained items or protected finishes
  7. 07Site-specific RAMS requirements

Ask for our H&S pack.