Halifax House, Manchester — Commercial Strip-Out

Internal soft-strip, redundant services removal and waste clearance

Client
Tilbury Hall
Location
Bridge Street, Manchester
Contractor
Site Service Regions
Office interior at Halifax House during strip-out, showing exposed overhead structure and cleared floor areas.
Internal office strip-out in progress at Halifax House.
01

Overview

Site Service Regions carried out the internal strip-out at Halifax House for Tilbury Hall, removing the existing office fit-out to prepare the space for refurbishment.

The package covered floor finishes and raised access flooring, suspended ceilings, internal partitions, doors and kitchen fittings. It also included the removal of redundant mechanical and electrical items within the agreed scope.

02

The work

Our team stripped out the internal finishes and fittings, working through the different areas of the building. Redundant services and equipment formed part of the removal package, with specialist isolation and making safe required from the relevant contractors before removal.

  • Floor finishes and raised access flooring.
  • Suspended ceiling tiles and grids.
  • Non-loadbearing partitions, doors and frames.
  • Kitchen fittings and associated joinery.
  • Redundant cabling, cable tray, pipework and plant.
  • Segregation and removal of strip-out waste.
03

Managing the materials

Site footage captured the work in progress, with timber, metal and other removed materials separated into different areas. Material handling and waste clearance were an important part of managing the strip-out alongside the removal work.

04

Work in progress

Office interior at Halifax House during strip-out, showing exposed overhead structure and cleared floor areas.
Internal office strip-out in progress at Halifax House.
Timber stacked beside an area of removed flooring during the Halifax House strip-out.
Flooring removal and timber collected within the work area.
Removed doors and panels standing against a wall inside Halifax House during strip-out.
Internal strip-out and removed fittings awaiting clearance.
Timber and other removed fit-out materials grouped inside Halifax House during the works.
Removed materials grouped within the working area.

Halifax House strip-out — work in progress

05

The result

The existing office fit-out was stripped back, preparing the agreed areas for the next stage of Tilbury Hall’s refurbishment.

Have a similar project coming up?

Site Service Regions and Site Service London cover soft-strip, demolition and waste removal across the North West and London.

Send your drawings and scope to glen@siteserviceregions.co.uk.

Send us your tender enquiry