SSL & SSR Services

Office Strip-Out

Office strip-out and reinstatement works for landlords, tenants, main contractors and fit-out teams.

Office Strip-Out commercial contractor work

What This Includes

Practical scope, clearly priced.

/Cat A and Cat B strip-out
/Meeting rooms and partitions
/Raised floors and floor finishes
/Suspended ceilings
/Tea points and WCs
/Data, lighting and small power removal after isolation

Typical projects

  • /Occupied-building phases
  • /Floor-by-floor refurbishments
  • /Dilapidations
  • /Landlord returns
  • /Fit-out enabling

What clients receive

  • /Programme-aware strip-out sequence
  • /Waste and loading plan
  • /Retained-area protection
  • /Clear handover for follow-on trades

H&S approach

  • /Project-specific RAMS before commencement
  • /Service isolation confirmation before M&E take-out
  • /Agreed waste routes, loading points and housekeeping controls
  • /Coordination with the main contractor, landlord team and follow-on trades

How We Plan It

From tender pack to handover.

  1. 01

    Review the tender pack

    Drawings, scope or BOQ and site photographs are reviewed so the office strip-out price reflects the real scope.

  2. 02

    Access and logistics

    Loading points, lifts or stair routes, delivery windows, working hours and building rules are confirmed with the client team.

  3. 03

    Waste arrangements

    Segregation, skip or bin movements and licensed waste carriers are planned, with Waste Transfer Notes provided.

  4. 04

    RAMS and mobilisation

    Project-specific RAMS are produced before commencement; service isolations are by others unless agreed.

Coverage

London and nationwide.

FAQs

Tender questions, answered.

Can you work nights and weekends?

+

Yes. Out-of-hours strip-out can be planned around trading hours, occupied floors and building rules, with shift times, noise limits and waste movements agreed with the client before works start.

Can you work in occupied or live buildings?

+

Yes. Works are phased around live areas with protection, segregation, agreed access routes and timed waste movements. Building rules and restrictions are confirmed with the main contractor or landlord team at pre-start.

How is waste segregated and documented?

+

Waste is segregated on site wherever practicable — typically metal, timber, plasterboard and general waste — and removed through licensed waste carriers. Waste Transfer Notes and duty-of-care documentation are provided, with waste reports available where required.

Do you provide RAMS?

+

Yes. Project-specific RAMS are produced before commencement, and operatives are briefed on the RAMS and site rules before works start. Service isolations are carried out by others unless agreed otherwise.

Which areas do you cover?

+

Site Service London (SSL) covers London and surrounding areas. Site Service Regions (SSR), based in Manchester, covers work outside London nationwide. Send the project location with your tender and it will be routed to the right team.

What do you need to price a tender?

+

Drawings, a scope of works or BOQ, site photographs, the site address or postcode, programme or start date, tender return date and any known access, loading or working-hour restrictions. Large tender packs can be emailed directly.

Need office strip-out priced?

Send drawings, BOQs, photos or a scope and we’ll route it to the right SSL / SSR team.

Send Us Your Tender