Internal soft strip-out, WC strip-out, M&E removals after isolation and external redundant services removal

Site Service Regions / Site Service London were appointed by ROM Construction to carry out a soft strip-out package at Kiddos, New Malden.
The project involved works across the ground floor, first floor and second floor, taking the building back to a safe shell condition ready for follow-on refurbishment trades.
The works were completed within a tight three-week programme, with waste managed through agreed routes down to the loading bay.
Works spanned three floors with waste manually moved down stairs to the loading bay, requiring careful planning, clear waste routes and disciplined housekeeping throughout.
Delivery took place during a period of hot weather, so supervision, operative welfare, manual handling and safe working practices had to be closely managed each day.
Before works started, all operatives were briefed on the project RAMS, site rules and agreed method of works. Key controls included:
Waste was segregated wherever practicable, including metal, timber, plasterboard and general waste streams.
Materials were reduced into manageable sections, transferred safely to the loading area and removed using licensed waste carriers.
Waste documentation was maintained throughout the project.
The works were completed within the agreed programme and the building was left stripped, cleared and ready for follow-on trades.
The project shows SSL / SSR delivering multi-floor commercial strip-out works where access and waste removal routes needed close control.
More project details coming soon
Approx. size
Coming soon
Operatives
Coming soon
Waste removed
Coming soon
Recycling / diversion
Coming soon
Services Delivered
Send drawings, BOQs, photographs or a scope and we’ll route it to the right SSL / SSR team.
Send Us Your Tender